We put the base ahead of the finish
Everybody sees the finish on a new slab, and nobody sees the base. That's why the base is the first thing that gets cut when a budget is tight, with the dirt raked level instead of dug out and packed. A slab on loose dirt settles with it, and it cracks where nobody planned. So if something has to give, I'd rather simplify the finish than thin the base.
We also check where your water runs before we set a single form, because a slab that tips toward the house sends rain to your foundation. We pick the pour time with care, since concrete finished in midday heat can end up with a weak, dusty top. If you'd like to talk through your own yard, call (323) 471-6288 or send us the details.

